- Search By:
- Service Category
- Type of Service
- All Projects
- Aid to Haiti
- Alaskan Shipwreck Fuel Removal
- CD5 Bridge Components Delivered
- D.O.D Cargo Delivered
- Delivering Crucial Aid
- Delivery of Nations Largest Floating Dock
- Doosan Crane Delivery
- Everett Crane Move
- First U.S. Flagged LNG Bunker Barge
- Foss Assists in Hurricane Recovery
- Foss Completes Multi-year Sakhalin Sealift
- Foss Transports World’s Largest Railcar Barge
- Historic Final Voyage
- Historic Voyage to Revelstoke
- Jacket Delivered to West Africa
- Kearl Oil Sands Module Transport
- Massive Coke Drums Delivered
- Mercosur Shuttle Group
- Motiva Refinery Expansion
- Navy Radar Vessel Assists
- Offshore Tanker Mooring Support
- One Thousandth Boeing Barge load Delivered
- Open Lighterage at Red Dog Mine
- Power Equipment Transport
- Punta Lima Wind Farm
- Restoring Port au Prince
- Rig Tow to Cook Inlet
- Sakhalin Island Oil Production Facility
- Sealift to Alaskan North Slope
- Sealift To The Alaskan Arctic
- Shell Arctic Offshore Support
- USCG Loran Decommissioning
- Young Brothers Profile
- Zadco Transport
The Project:
Foss Maritime transported 11,000 tons of construction materials for the Conoco Philips – CD5 bridge project to build four bridges across the Colville River connecting Conoco’s Alpine Facility to a satellite operation in the National Petroleum Reserve of Alaska (NPRA). In voyages in August and November 2013, concrete deck panels and bridge girders were towed from Tacoma, WA to Valdez, AK and stored to await transit over the ice roads to the construction site by Foss’s sister company Carlile Transportation.
Services Provided:
- Domestic Project Cargo Transportation
- Oil Field Services
- Construction Support
- Naval Architecture and Marine Engineering
- Ocean Towing
- Voyage Planning
Highlights:
- Worked in partnership with Carlile Transportation and ConocoPhillips to successfully deliver bridge components to a remote, arctic site.
- In August 2013, the Ocean Pathfinder towed a 330’ x 86’ barge laden with 6,700 short tons of concrete deck panels and bridge girders from Tacoma to Valdez.
- In November 2013, the Lauren Foss towed a similar barge laden with 4,500 short tons of bridge girders, construction materials and equipment.
- Specially designed stanchions were engineered to assure proper stowage and sea fastening of roadway panels.