- Search By:
- Service Category
- Type of Service
- All Projects
- Aid to Haiti
- Alaskan Shipwreck Fuel Removal
- CD5 Bridge Components Delivered
- D.O.D Cargo Delivered
- Delivering Crucial Aid
- Delivery of Nations Largest Floating Dock
- Doosan Crane Delivery
- Everett Crane Move
- First U.S. Flagged LNG Bunker Barge
- Foss Assists in Hurricane Recovery
- Foss Completes Multi-year Sakhalin Sealift
- Foss Transports World’s Largest Railcar Barge
- Historic Final Voyage
- Historic Voyage to Revelstoke
- Jacket Delivered to West Africa
- Kearl Oil Sands Module Transport
- Massive Coke Drums Delivered
- Mercosur Shuttle Group
- Motiva Refinery Expansion
- Navy Radar Vessel Assists
- Offshore Tanker Mooring Support
- One Thousandth Boeing Barge load Delivered
- Open Lighterage at Red Dog Mine
- Power Equipment Transport
- Punta Lima Wind Farm
- Restoring Port au Prince
- Rig Tow to Cook Inlet
- Sakhalin Island Oil Production Facility
- Sealift to Alaskan North Slope
- Sealift To The Alaskan Arctic
- Shell Arctic Offshore Support
- USCG Loran Decommissioning
- Young Brothers Profile
- Zadco Transport
The Project:
During the 2016 and 2017 ice-free seasons, Foss completed a major sealift to an oilfield development project on remote Sakhalin Island off the coast of eastern Russia – including delivery of the largest land-based drill rig in the world. Traveling more than 240,000 nautical miles, the project included multiple tows from Texas and South Korea. Fifteen barges, 15 ocean-going tugs, and six shallow-draft tugs safely and successfully delivered 39 modules weighing as much as 2,600 tons.
Services Provided:
- International Project Cargo Transportation
- Oil Field Services
- Project Management and Logistics
- Ocean Towing
- Naval Architecture and Engineering
Highlights:
- Land-based drill rig deconstructs into 14 modules for transportation from Brownsville, Texas, to Sakhalin Island, requiring five tug and barge sets.
- Delivered 10 piperacks and 15 processing modules from Ulsan, South Korea.
- Provided bathymetric surveying and placed navigation buoys and mooring anchors to account for ice coverage and changing navigable channels.
- On-site teams provided engineering and naval architecture solutions, ballasting, stevedores, and local interface in Brownsville, Ulsan and Odoptu.
- A dedicated project management team assisted in permitting and local compliance and managed local labor.