- Search By:
- Service Category
- Type of Service
- All Projects
- Aid to Haiti
- Alaskan Shipwreck Fuel Removal
- CD5 Bridge Components Delivered
- D.O.D Cargo Delivered
- Delivering Crucial Aid
- Delivery of Nations Largest Floating Dock
- Doosan Crane Delivery
- Everett Crane Move
- First U.S. Flagged LNG Bunker Barge
- Foss Assists in Hurricane Recovery
- Foss Completes Multi-year Sakhalin Sealift
- Foss Transports World’s Largest Railcar Barge
- Historic Final Voyage
- Historic Voyage to Revelstoke
- Jacket Delivered to West Africa
- Kearl Oil Sands Module Transport
- Massive Coke Drums Delivered
- Mercosur Shuttle Group
- Motiva Refinery Expansion
- Navy Radar Vessel Assists
- Offshore Tanker Mooring Support
- One Thousandth Boeing Barge load Delivered
- Open Lighterage at Red Dog Mine
- Power Equipment Transport
- Punta Lima Wind Farm
- Restoring Port au Prince
- Rig Tow to Cook Inlet
- Sakhalin Island Oil Production Facility
- Sealift to Alaskan North Slope
- Sealift To The Alaskan Arctic
- Shell Arctic Offshore Support
- USCG Loran Decommissioning
- Young Brothers Profile
- Zadco Transport
The Project:
Foss Maritime successfully delivered 155 Korean-built modules in support of the Kearl Oil Sands project near Fort McMurray, Alberta – one of Canada’s largest open-pit mining operations. The oversized modules were transported in 40 trips up the Columbia and Snake river system from Vancouver, WA to Pasco, WA and Lewiston, ID on barges retrofitted to operate in river conditions and travel in tandem. They were then transshipped to Canada to create the Kearl Sands state-of-the-art processing facility in the Athabasca Oil Sands region of northern Alberta.
Services Provided:
- Harbor Towing
- Project Cargo & Logistics
- Ballasting & Mooring
- Marine Engineering
- Construction Support
Highlights:
- Worked in partnership with Imperial Oil, ExxonMobil, Fluor, and Mammoet
- ransported 155 pieces of production equipment sized up to 120’ by 24’ and 25’ high
- Designed and fabricated ballasting systems for the barge Sitka; Upgraded and improved the system in barge 286-3
- Provided ballasting in Lewiston, ID while modules were safely unloaded
- Foss vessels the P.J. Brix tug pushed the barges while the Betsy L tug pulled the barges on a towline
- The Kearl Sands project could eventually produce up to 345,000 barrels of oil per day
- The complex and logistically challenging project was completed on time and ahead of schedule