- Search By:
- Service Category
- Type of Service
- All Projects
- Aid to Haiti
- Alaskan Shipwreck Fuel Removal
- CD5 Bridge Components Delivered
- D.O.D Cargo Delivered
- Delivering Crucial Aid
- Delivery of Nations Largest Floating Dock
- Doosan Crane Delivery
- Everett Crane Move
- First U.S. Flagged LNG Bunker Barge
- Foss Assists in Hurricane Recovery
- Foss Completes Multi-year Sakhalin Sealift
- Foss Transports World’s Largest Railcar Barge
- Historic Final Voyage
- Historic Voyage to Revelstoke
- Jacket Delivered to West Africa
- Kearl Oil Sands Module Transport
- Massive Coke Drums Delivered
- Mercosur Shuttle Group
- Motiva Refinery Expansion
- Navy Radar Vessel Assists
- Offshore Tanker Mooring Support
- One Thousandth Boeing Barge load Delivered
- Open Lighterage at Red Dog Mine
- Power Equipment Transport
- Punta Lima Wind Farm
- Restoring Port au Prince
- Rig Tow to Cook Inlet
- Sakhalin Island Oil Production Facility
- Sealift to Alaskan North Slope
- Sealift To The Alaskan Arctic
- Shell Arctic Offshore Support
- USCG Loran Decommissioning
- Young Brothers Profile
- Zadco Transport
The Project:
Safely transported six huge coke drums from the Port of Los Angeles on an approximately 28-mile voyage to King Harbor in Redondo Beach for installation at Chevron’s El Segundo Refinery. Foss collaborated with heavy-lift company Mammoet USA, utilizing a detailed ballasting plan to keep the barge level during operations, which required the placement of ramps to load and unload. Self-propelled modular transporters (SPMTs) moved the cylinders from the barge moored at a levee in a yacht marina to a staging site near the final destination of the drums at the refinery.
Services Provided:
- Oil Field Services
- Domestic Project Cargo Transportation
- Regional Towing
Highlights:
- On three successive Mondays in February and March 2013, the drums were carried two at a time on the barge ZB 240 towed by the Edith Foss and assisted by the Pacific Queen.
- Each coke drum is 100’ long x 28’ in diameter and weighs 500,000 pounds.
- The new drums replace existing drums built in 1968. They will increase the
reliability of the coke drum operations and take advantage of more than 40 years
of industry advances in coke drum design. - Foss collaborated with Chevron, Mammoet USA and Fluor, a global engineering
construction company, to develop a complex and comprehensive transport safety
matrix for the project. - Attention to detail and commitment to the continual improvement process were
key to the success of these operations. Innovation developed from the first landing was incorporated into the second and third landings, such as doubling the wooden crane mats, securing them with an anchoring system and lashing them
together to improve the rock piling fendering system.